Error message

Notice: unserialize(): Error at offset 17 of 21 bytes in variable_initialize() (line 1202 of /home/webserver/website/includes/bootstrap.inc).

THANG LONG & DONG DO FIELD DEVELOPMENT

THANG LONG & DONG DO FIELD DEVELOPMENT

1. Client : Global Process Systems Pte.Ltd

2.Design and Fabrication of 13 Units Pressure Vessel :

  • Low Temperature LTS
  • Cooling Water Expansion Vessel
  • LP Flare Knock Out Drum
  • HP Flare Knock Out Drum
  • Closed Drain Drum
  • HP Separator
  • MP Separator
  • LP Separator
  • 2nd Stage GAS Export Compressor Suction Scrubber
  • 3rd Stage GAS Export Compressor Suction Scrubber
  • Gas Condensate LTS
  • Produced Water Degasser
  • Fuel Gas Scrubber

3. Fabrication Year : 2012

4. Project Destination : Vietnam